58 Netra 240 Server Service Manual • June 2004
3. Connect the two cables to the system board and route it behind the post
(
FIGURE 4-2).
Note – Refer to the chassis label for an illustration of the correct routing of the
cables.
4. Close the rotating service module.
See “Closing the Rotating Service Module” on page 31.
5. Install the server cover.
See “Installing the Server Cover” on page 29.
6. Power on the server.
See “Powering On the Server” on page 20.
SCSI Interface Board
The SCSI interface board houses the two hard drives.
Removing the SCSI Interface Board
1. Power off the server.
See “Powering Off the Server” on page 22.
2. Grip the bezel at the two finger holds and rotate it down to its open position
(
FIGURE 2-4).
3. Make a note of which drive bay holds each hard drive.
You remove the hard drives in the next step. However, you want to install the hard
drives back into the same slots that you removed them from at the end of this
procedure.
4. Remove the hard drives from the drive bays.
See “Removing a Hard Drive” on page 40.
5. Remove the server cover.
See “Removing the Server Cover” on page 27.