EasyManua.ls Logo

Sungrow SC50HV - Installation; Installation Site Selection

Sungrow SC50HV
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
19
5 Installation
5.1 Installation Site Selection
Select an optimal installation site for safe operation, long service life and
outstanding performance.
Take the load capacity of the wall into account. The wall (concrete wall or
metal frame) should be strong enough for the weight of the PCS over a long
period.
Install the PCS in a convenient location for electrical connection, operation
and maintenance.
Do not install the PCS on the wall made
up of flammable materials.
material
Flammable wall
Do not install the PCS near flammable
materials or gas.
Flammable material or
gas near the
installation

Table of Contents