EasyManua.ls Logo

Suzuki VL125 - Engine Reinstallation

Suzuki VL125
242 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-8 ENGINE
ENGINE REINSTALLATION
Reinstall the engine in the reverse order of engine removal.
Install the engine mounting bolts and nuts as shown in the following illustration.
Tighten the engine mounting bolts and nuts to the specified torque.
NOTE:
The engine mounting nuts are self-locking. Once the nuts have been removed, they are no longer of any
use.
BOLT LENGTH
1 67 mm
2 65 mm
3,4,5 102 mm
"
ITEM N
.
m kgf
.
m
A,C,D,E 40 4.0
B 40 4.0
F 23 2.3

Table of Contents

Related product manuals