EasyManua.ls Logo

Suzuki VL125 - Transmission Disassembly and Inspection

Suzuki VL125
242 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-44 ENGINE
TRANSMISSION
DISASSEMBLY
Disassemble the transmission gears as shown in right pictures.
1 Drive shaft
2 2nd driven gear
3 4th driven gear
4 3rd driven gear
5 5th driven gear
6 1st driven gear
7 Countershaft
8 5th drive gear
9 3rd drive gear
0 4th drive gear
A 2nd drive gear
INSPECTION
GEAR-SHIFTING FORK
Using a thickness gauge, check the shifting fork clearance in the
groove of its gear.
The clearance for each of the three shifting forks plays an im-
portant role in the smoothness and positiveness of shifting ac-
tion.
If the clearance checked is noted to exceed the limit specified,
replace the fork or its gear, or both.
% 09900-20803: Thickness gauge
09900-20101: Vernier calipers
# Shift fork Groove clearance:
Standard: 0.20 0.40 mm
Service Limit: 0.60 mm
# Shift fork groove width:
Standard: 4.25 4.35 mm
# Shift fork thickness:
Standard: 3.95 4.05 mm

Table of Contents

Related product manuals