266 Power Management Unit Card and Board Replacement TB8100 Service Manual
© Tait Electronics Limited September 2006
Reprogramming 
and Recalibration
If you have changed the configuration of the PMU by fitting or removing 
an auxiliary power supply board, you will have to reprogram the PMU as 
described in the table below.
There is no need for any recalibration when this board is fitted, removed or 
replaced.  
Procedure Details
reprogram the product code use the Calibration Kit to reprogram the 
PMU with the product code which 
corresponds to the new configuration of the 
PMU
a
;  for more details refer to “Identifying 
the PMU” on page 217, and to the 
Calibration Kit documentation
a. To reprogram this information into the PMU, you will need to use a dongle with the 
Calibration Kit.