EasyManua.ls Logo

TESTO 300 LL - O2 air (EU regulation)

TESTO 300 LL
71 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9 Performing the measurement
52
9.6.8
O
2
air (EU regulation)
An O
2
dual wall clearance probe (0632 1260) must be connected.
1
Call up function: | O
2
air
2
Start measurement: tap .
Reading is displayed.
4
End measurement: tap .
9.6.9
Clock Meter
The function is only available if the chosen fuel is a gas.
The gas burner capacity is calculated by means of the gas amount consumed.
To this end, a gas amount is input, and its consumption read out at the gas
meter.
1
Call up function: | Clock Meter
2
Set the gas amount to watch for at the gas meter.
3
Set the heating value of the burnt gas.
4
Start measurement: tap .
The test time is displayed.
5
When the set gas amount is reached: tap .
The calculated gas flow and the gas burner capacity (in BTU/h) are
displayed.
Edit values
All values that can be modified have a dotted underlining.
w ww. . com
information@itm.com1.800.561.8187

Table of Contents

Related product manuals