9 Performing the measurement
57
Pretest (EU regulation)
Insert the connector plug of the hose connection kit (0554 1203) into
the flue gas socket and lock it in place by turning it slightly clockwise
(bayonet fitting).
Performing the measurement
The pressure socket of the instrument must be free (depressurized, not
closed).
Pressure zeroing has been performed.
Call up function: | Pretest
Set parameters or enter values.
All values that can be modified have a dotted underlining.
Start stabilization time: tap . If applicable, follow instructions.
Reading is displayed.
Stabilization time is finished.
End stabilization time early: tap .
Measuring time starts.
The readings are automatically saved and displayed after the
measurement has been completed.
The measuring value result can be assessed.
Conclude measurement: tap Next.
If applicable, repeat measurement: tap .
w ww. . com
information@itm.com1.800.561.8187