EasyManuals Logo

TESTO Saveris T3 Commissioning Instructions

TESTO Saveris T3
120 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #40 background imageLoading...
Page #40 background image
6 Commissioning
40
19
Click in the Connection type cell of the data logger which needs to be
assigned to a Saveris router.
The cell is shown as a selection list.
20
Use the button to open the selection list and select the Saveris router
which the data logger needs to be assigned to.
Data loggers which are in a mobile zone cannot be assigned to a
Saveris router.
21
Perform steps 16 and 17 for all other data loggers with measurement
data that need to be transmitted to the Saveris base via a router.
22
Click on [Next >].
The information about the start of
measurement and the project name
are displayed.
23
Postpone start of measurement if necessary.
24
Change the Project name in the project name field.
Think of a unique name for the project that you will be able to easily
associate with the project later.
The project name cannot subsequently be changed.
25
Click on [Finish] to end the commissioning of the hardware.
The dialogue for the conclusion of the
commissioning is shown.

Table of Contents

Other manuals for TESTO Saveris T3

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the TESTO Saveris T3 and is the answer not in the manual?

TESTO Saveris T3 Specifications

General IconGeneral
BrandTESTO
ModelSaveris T3
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals