Document Ref 941113-001 Rev 2 Page 6-9
Quantium 310 Maintenance Manual Maintenance Procedures - VR
8) Pull the solenoid cable down through the glands to the ECVR
unit.
9) Remove the nut securing the solenoid to the plunger.
10) Lift the solenoid off the plunger and remove from the unit.
11) Place the new solenoid valve onto the plunger and secure in
position using the nut.
12) Feed the solenoid cable up through the relevant gland(s) and
into the calculator head. Replace the cable ties and tighten the
gland(s) securely.
Note : ensure that the cable is routed and contained
accordingly.
13) Route the solenoid cable to the ECVR Board.
14) Using the small flathead screwdriver, re-fit the connector to
the solenoid cable.
Note : refer to the wiring diagrams in section 7.
15) Re-connect the connector to the ECVR Board.
16) Ensure that all tools and unused materials are removed.
17) Re-fit the side panel to the dispenser.
18) Close the hydraulic door(s) and lock.
19) Close the calculator head door and lock.
20) Re-instate power to the dispenser.
21) Test the operation of the new solenoid valve.
22) Dispose of all waste accordingly.