TransportingtheMachine
Note:Refertothechemical-warning-productlabel(s)before
transportingtheunitandfollowalllocal/state/federal
requirementsfortransportingchemicals.
Note:Ensurethatthespreader-hoppercoverandthespray
wandaresecurebeforetransporting.
Useaheavy-dutytrailerortrucktotransportthemachine.
Ensurethatthetrailerortruckhasallthenecessarybrakes,
lighting,andmarkingasrequiredbylaw .Pleasecarefullyread
allthesafetyinstructions.
Totransportthemachine:
1.Attheleftsideofthemachineensurethattheshut-off
valveforthesprayertankisclosedandthedrainplug
issecure.Attherightsideofthemachineensurethat
thepump-shut-offvalveisclosed.
2.Ifusingatrailer,connectittothetowingvehicleand
connectthesafetychains.
3.Ifapplicable,connectthetrailerbrakes.
4.Loadthemachineontothetrailerortruck.
5.Shutofftheengine,removethekey,setthebrake,and
closethefuelvalve.
6.Settheparkingbrakeandblockthetires.
7.Usethetie-downpointsonthemachinetosecurely
bindthemachinetothetrailerortruckwithstraps,
chains,cable,orropes(Figure55).
Note:Refertoyourlocalordinancesforspecic
trailerandtie-downregulations.
Figure56
1.Fronttie-downpoints2.Reartie-downpoints
47