g014220
Figure64
1.Flatontheactuatorrod5.Eyeletadjusted
2.Jamnut
6.Eyeletpositionfor
assembly
3.Eyelet7.Jamnuttightenedtolock
newposition
4.Jamnutloosened
6.Turntheeyeletrodintheactuatorrodtoshorten
orlengthentheextendedactuatortothedesired
position(Figure64).
Note:Youmustturntheeyeletrodinhalfor
completerevolutionssothatyoucanassemble
therodtotheboom.
7.Oncethedesiredpositionhasbeenachieved,
tightenthejamnuttosecuretheactuatorand
eyeletrod.
8.Raisetheboomtoalignthepivotwiththe
actuatorrod.
9.Whileholdingtheboom,insertthepinthrough
bothboompivotandactuatorrod(Figure63).
10.Withthepininplace,releasetheboomand
securethepinwiththecotterpreviously
removed.
11.Repeattheprocedureforeachactuatorrod
bearing,ifnecessary.
Cleaning
CleaningtheFlowMeter
ServiceInterval:Every200hours/Yearly(whichever
comesrst)(moreoftenwhenusing
wettablepowders).
1.Thoroughlyrinseanddraintheentirespraying
system.
2.Removetheowmeterfromthesprayerand
ushitwithcleanwater.
3.Removetheretainerringontheupstreamside
(Figure65).
g012934
Figure65
1.Flange(ow-meterbody)6.Stud(turbine)
2.Rotor/magnet
7.Wire-harnessclamp
3.Upstreamhubandbearing
(withkeywayup)
8.Flange-headscrew
4.Downstreamhub(with
keywayup)
9.Sensorassembly
5.Retainingring
4.Cleantheturbineandtheturbinehubtoremove
metallingsandanywettablepowders.
5.Inspecttheturbinebladesforwear.
Note:Holdtheturbineinyourhandandspin
it.Itshouldspinfreelywithverylittledrag.Ifit
doesnot,replaceit.
6.Assembletheowmeter.
7.Usealowpressure(50kPaor5psi)airjetto
ensurethattheturbinespinsfreely.
Note:Iftheturbinedoesnotspinfreely,loosen
thehexstudonthebottomoftheturbinehubby
1/16ofaturnuntilitdoesspinsfreely.