PTOSwitchTest(continued)
•Pins2–4shouldhavecontinuity(closed)
•Pins7–8shouldNOThavecontinuity(open)
C.WiththeswitchintheONmomentaryposition
•Pins2–4shouldhavecontinuity(closed)
•Pins7–8shouldhavecontinuity(closed)
PTOSwitchInstallation
1.PlacethePTOswitchintopositiononthecontroltower.
2.ConnectthemainwireharnesstothePTOswitch.
g312562
Figure121
3.Connectthepositivebatterycablerst,thenthenegativebatterycableto
thebattery.
PTOClutchReplacement
PTOClutchRemoval
1.Parkthemachineonalevelsurfaceandsettheparkingbrake.Stopthe
engine,waitforallmovingpartstostopandremovethekey.
2.Disconnectthebatterybyremovingthenegativebatterycablerst,then
thepositivecablefromthebattery.
3.Removethespringfromthedeckidler.
4.RemovethedeckbeltfromthePTO.
5.DisconnectthePTOclutchfromthewiringharness.
6.RemovetheboltsecuringthePTOclutchtothemachine.Removethe
PTOclutch.
CoilResistanceMeasurementTest
1.Parkthemachineonalevelsurfaceandsettheparkingbrake.Stopthe
engine,waitforallmovingpartstostopandremovethekey.
2.Disconnecttheclutchwireconnector.
PROLINE®ServiceManual
Page9–11
ElectricalSystem:ServiceandRepairs
3431-988RevA