CoilResistanceMeasurementTest(continued)
3.Setthemulti-metertomeasureresistance(OHMssetting).
4.Connectthemeterleadwirestotheterminalsintheclutchconnector.
5.SeethePTOClutchElectricalSpecicationschart.
Resistance(OHMs)
AmpDraw
ContinuitytoGround
3.05±5%
3.93
Open
PTOClutchContinuitytoGroundCheck
1.Parkthemachineonalevelsurfaceandsettheparkingbrake.Stopthe
engine,waitforallmovingpartstostopandremovethekey.
2.Disconnecttheclutchwireconnector.
3.Setthemulti-metertomeasureresistance(OHMsetting).
4.Connectonemulti-meterleadtotheengine,chassisorbatteryground.
Connecttheothermulti-meterleadtoeachoftheclutchconnectorterminals.
5.The2clutchconnectorterminalsshouldneverhavecontinuitytoground
andshouldOPENatalltimes.
6.IfcontinuityisfoundbetweenthePTOconnectorandground,thePTOclutch
andthePTOswitchmustbereplaced.
MeasureClutchCurrentDraw
Donotmeasurecurrentdrawiftheclutchhasshortedtogroundorifthe
resistancemeasurementisoutofspecication.
1.Parkthemachineonalevelsurfaceandsettheparkingbrake.Stopthe
engine,waitforallmovingpartstostopandremovethekey.
2.Disconnecttheclutchwireconnector.
3.Setthemulti-metertomeasureamps(10ampscale).
4.ConnectthepositivemeterleadtothechassisharnessterminalA.
5.ConnectthenegativemeterleadtothecorrespondingwireterminalB.
6.ConnectashortjumperleadfromterminalCtoterminalD.
7.Turntheignitionswitchtothe“RUN”positionandthePTOclutchtothe“ON”
position.
8.RecordtheampreadingandrefertothePTOClutchElectricalSpecication
Chart.
PTOClutchElectricalSpecicationChart
Resistance(OHMs)
AmpDraw
ContinuitytoGround
3.05±5%
3.93
Open
PTOClutchInstallation
1.InstallthePTOclutchtothemachine,securewithbolt.Torqueboltto74N•
m(55±5ft-lb).
2.ConnectthePTOclutchtothewiringharness.
3.InstallthedeckbelttothePTO.
4.Installthespringtothedeckidler.
5.Connectthepositivebatterycablerst,thenthenegativebatterycableto
thebattery.
ElectricalSystem:ServiceandRepairs
Page9–12
PROLINE®ServiceManual
3431-988RevA