EasyManua.ls Logo

Toshiba e-STUDIO2820C - Adjustment of the Auto-Toner Sensor; 3 Adjustment

Toshiba e-STUDIO2820C
486 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
© 2008 TOSHIBA TEC CORPORATION All rights reserved e-STUDIO2820C/2830C/3520C/3530C/4520C
ADJUSTMENT
3 - 3
3.1.2 Adjustment of the Auto-Toner Sensor
When the developer material is replaced, adjust the auto-toner sensor in the following procedure.
(1) Install the cleaner and developer unit.
Note:
Do not install the toner cartridge.
(2) While pressing [0] and [5] simultaneously, turn the power ON. The following message will be dis-
played.
Fig. 3-2
(3) Key in a code and press the [START] button.
Fig. 3-3
(4) The message below will be displayed approx. 2 minutes later and the adjustment starts:
During the adjustment, "Current sensor voltage (V)" shown in (B) automatically changes and
gradually approaches to "Target value (V) for adjustment reference voltage" shown in (A).
Fig. 3-4
(5) When the "Current sensor voltage (V)" in (B) is converged and the "Sensor output control value
(bit value)" corresponding to the value for initial developer material is displayed in (C), the adjust-
ment is completed.
When the adjustment is completed, the [ENTER] button is displayed on the screen.
Code 200: All developer materials 201: Developer material Y 202: Developer material M
203: Developer material C 204: Developer material K
100% A
A3
TEST MODE
[
0
]
[
5
]
[
POWER
]
100% 200
A3
TEST MODE
(
Code
)
[
START
]
(
B
)
(
C
)
(
A
)
M: z.zzV C: z.zzV K: z.zzVY: z.zzV
M: x.xxV C: x.xxV K: x.xxVY: x.xxV
M: C: K: ww%Y:
(
B
)
: Current sensor voltage
(
V
)
(
A
)
: Target value
(
V
)
for adjustment reference voltage
(
C
)
: Adjustment value, Humidity (%)

Table of Contents

Related product manuals