5
© 2008 TOSHIBA TEC CORPORATION All rights reserved e-STUDIO2820C/2830C/3520C/3530C/4520C
PREVENTIVE MAINTENANCE (PM)
5 - 1
5. PREVENTIVE MAINTENANCE (PM)
5.1 General Description
The purpose of preventive maintenance (PM) is to maintain the quality level of this equipment by peri-
odically inspecting and cleaning this equipment and also replacing the parts whose replacement timing
has come according to the maintenance contract. There are PM kits packaged for each unit or a group
of parts with the same replacement number of output pages, allowing you to carry out efficient parts
replacement.
Also to maintain the quality level of the equipment, overhauling is required when a specified number of
pages has been printed or when a specified period of time has passed, regardless of the number of out-
put pages.
5.2 General Descriptions for PM Procedure
(1) Preparation
• Ask the user about the current conditions of the equipment and note them down.
• Before starting maintenance, make some sample copies and store them.
• See the replacement record and check the parts to be replaced in the PM support mode (6S-
2) or list printing mode (9S-103).
6S-2 : [6] + [START] + [POWER] ON [2] [START]
9S-103 : [9] + [START] + [POWER] ON [103] [START]
Fig. 5-1
• Turn OFF the power and make sure to unplug the equipment.
(2) Perform a preventive maintenance using the following checklist and illustrations. Refer to the
Service Manual if necessary.
(3) Plug in the equipment after the maintenance has been finished. Then turn ON the power and
make some copies to confirm that the equipment is working properly.
PM SUPPORT CODE LIST
MM-DD-YY HH:MM
UNIT OUTPUT PAGES/ PM OUTPUT PAGE/ DRIVE COUNTS PM DRIVE COUNTS
DEVELOP COUNTS DEVELOP COUNTS
DRUM(K) 342 70000 4377 130000
DRUM BLADE(K) 342 70000 4377 130000
DRUM BRUSH(K) 342 70000 4377 130000
GRID(K) 342 70000 4377 130000
MAIN CHARGER NEEDLE(K) 342 70000 4377 130000
CHARGER CLEANING PAD(K) 177 70000 3681 130000