4
CVHE-SVX005C-EN
• The installing contractor must notify Trane—or an
agent of Trane specifically authorized to perform
startup and warranty of Trane® products—two weeks
in advance of the scheduled disassembly work to
coordinate the disassembly and reassembly work.
• Start-up must be performed by Trane or an agent of
Trane specifically authorized to perform startup and
warranty of Trane® products.
Trane, or an agent of Trane specifically authorized to
perform start-up and warranty of Trane® products, will
provide qualified personnel and standard hand tools to
perform the disassembly and reassembly work at a location
specified by the contractor. The contractor shall provide the
rigging equipment such as chain falls, gantries, cranes,
forklifts, etc. necessary for the disassembly and
reassembly work and the required qualified personnel to
operate the necessary rigging equipment.
Copyright
This document and the information in it are the property of
Trane, and may not be used or reproduced in whole or in
part without written permission. Trane reserves the right to
revise this publication at any time, and to make changes to
its content without obligation to notify any person of such
revision or change.
Trademarks
All trademarks referenced in this document are the
trademarks of their respective owners.
Factory Training
Factory training is available through Trane University™ to
help you learn more about the operation and maintenance
of your equipment. To learn about available training
opportunities contact Trane University™.
Online: www.trane.com/traneuniversity
Phone: 855-803-3563
Email: traneuniversity@trane.com
Revision History
• Updated X code in the cover page.
• Updated Symbio™ 800 throughout the document.
• Updated vent piping P
0
equations for rupture disk/
rupture guard.
• Updated Appendix E table.
Introduction