12
CVHE-SVX005C-EN
Type of Requirement
Trane Supplied
Trane Installed
Trane Supplied
Field Installed
Field Supplied
Field Installed
Water Piping Connection
Components
Flanged (optional)
• Welded on flange for
300 psig (2068.4 kPaG)
waterboxes
Flanged (optional)
• Victaulic® to flange
adapter for 150 psig
(1034.2 kPaG) waterboxes
Victaulic®
• Victaulic® coupling for 150 psig (1034.2 kPaG) and
300 psig (2068.4 kPaG) waterboxes
• Fasteners for flanged-type connections (optional)
Other Materials
• Trace gas (1 lb [0.45 kg] maximum per machine as needed
to perform leak testing)
• Material and equipment to perform leak testing
• Dry nitrogen (8 psig [55.2 kPaG] maximum per machine as
needed)
“Appendix B: Chiller
Installation Completion and
Request for Trane
Service,” p. 98 (CTV-
ADF001*-EN; refer to
“Appendix A: Forms and
Check Sheets,” p. 97)
• To be completed by installing contractor prior to contacting
Trane for start-up
Chiller start-up commissioning
(a)
• Trane, or an agent of Trane
specifically authorized to
perform start-up of Trane®
products
Post-commissioning transport
of empty refrigerant
containers for return or
recycling
• Move empty refrigerant containers to an easily accessible
point of loading
(a)
Start-up must be performed by Trane or an agent of Trane specifically authorized to perform start-up and warranty of Trane® products. Contractor shall provide Trane (or an
agent of Trane specifically authorized to perform start-up) with notice of the scheduled start-up at least two weeks prior to the scheduled start-up.
Storage Requirements
Note: If the chiller is stored outdoors for any amount of time,
do NOT remove ANY shipping coverings.
Protect the chiller from the elements and protect
against freezing, especially if any shipping
materials have been removed.
NOTICE
Equipment Damage!
Failure to protect the unit from freezing could result in
equipment damage.
If fluid has been added to the piping, the unit must be
protected from freezing. Freeze damage from an
unheated equipment room is not the Trane company's
responsibility. These are indoor units.
NOTICE
Insulation Damage!
Failure to follow these instructions could result in
insulation damage.
To prevent damage to factory installed insulation:
• Do not allow the insulation to be exposed to
excessive sunlight. Store indoors or cover with
canvas to prevent exposure.
• Do not use thinners and solvents or other types of
paint. Use only water base latex.
Less than 1 month 1–6 months Greater than 6 months
Location requirements:
• Solid foundation
• Vibration free
• Dry
• Temperature range -40°F to 158°F
(-40°C to 70°C)
Location requirements:
• Solid foundation
• Vibration free
• Dry
• Temperature range -40°F to 158°F
(-40°C to 70°C)
Location requirements:
• Solid foundation
• Vibration free
• Dry
• Temperature range -40°F to 158°F
(-40°C to 70°C)
• Do not remove any plastic coverings • Do not remove any plastic coverings • Do not remove any plastic coverings
• Do not charge the chiller with refrigerant
• If additional refrigerant is on site, follow
manufacturer’s storage requirements
• Do not charge the chiller with refrigerant
• If additional refrigerant is on site, follow
manufacturer’s storage requirements
• Do not charge the chiller with refrigerant
• If additional refrigerant is on site, follow
manufacturer’s storage requirements
• Verify dry nitrogen pressure using gauge
located on the evaporator shell reads
3 to 5 psig (20.7 to 34.5 kPaG)
• Notify the local Trane office if charge has
escaped
• Verify dry nitrogen pressure using gauge
located on the evaporator shell reads
3 to 5 psig (20.7 to 34.5 kPaG)
• Notify the local Trane office if charge has
escaped
• Verify dry nitrogen pressure using gauge located on
the evaporator shell reads 3 to 5 psig
(20.7 to 34.5 kPaG)
• Notify the local Trane office if charge has escaped
• Do not operate purge unit • Do not operate purge unit • Do not operate purge unit
Pre-Installation