EasyManua.ls Logo

Trane CenTraVac CVHE - Page 13

Trane CenTraVac CVHE
108 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CVHE-SVX005C-EN
13
Less than 1 month 1–6 months Greater than 6 months
Verify waterbox and tube bundles are
clean and dry
Verify waterbox and tube bundles are clean and dry
Conduct an oil analysis and verify no oil breakdown
(a)
Repeat yearly
Replace oil if breakdown has occurred
If no oil analysis program has been followed, replace
oil prior to start-up
Every six months, check unit pressure or vacuum and
take note of changes that could indicate a leak;
contact your local Trane office if any leaks occur
Every six months, start the oil pump and rotate
compressor shaft about 450° to prevent potential
bearing issues
(a)
; contact your local Trane Service
Agency to perform this task
If the chiller will be stored for more than six months
after production, contact your local Trane Service
Agency for required extended storage actions to
minimize impact to the chiller and preserve the
warranty.
Chillers stored five years or longer should be
inspected for leaks every five years by a qualified
service organization
(a)
If the chiller will be stored for more than six months after production, contact your local Trane Service Agency for required extended storage actions to minimize impact to the
chiller and preserve the warranty.
Pre-Installation

Table of Contents

Related product manuals