Installation (for qualified installers only) 7
© Travis Industries 3/13/18 - 1474 42 & 54PB GSB2 Aust.
Packing List
LP (Propane) Conversion Kit:
(42PB) Burner Orifice (1.45mm), Pilot Orifice (0.14 LP), LP Regulator
(54PB) Burner Orifice (1.65mm), Pilot Orifice (0.14 LP), LP Regulator
Thimble (2-Piece Assembly)
Pipe Shield, Header Shield (shipped attached to top of fireplace)
Additional Items Required
Gas Line Equipment (shutoff valve, pipe, etc.)
Electrical Equipment (min. 14 gauge, grounded line)
The 42PB Requires 7 lbs. of 1/4” Crushed Glass
The 54PB Requires 8 lbs. of 1/4” Crushed Glass
94500580 Platinum (10 lbs.)
94500581 Bronze (10 lbs.)
94500582 Cobalt (10 lbs.)
94500583 Black (10 lbs.)
Recommended Installation Procedure
Frame the opening for the fireplace. Make sure to allow for vent installation.
Install the vent, gas line and electrical hook-up.
Install the drywall.
Install the hearth (if applicable).
Install the facing (if applicable).
Install the mantel (if applicable).
Finalize the installation (see page 42).