Installation (for qualified installers only) 7
© Travis Industries 3/13/18 - 1474 42 & 54PB GSB2 Aust.
Packing List
• LP (Propane) Conversion Kit:
(42PB) Burner Orifice (1.45mm), Pilot Orifice (0.14 LP), LP Regulator
(54PB) Burner Orifice (1.65mm), Pilot Orifice (0.14 LP), LP Regulator
• Thimble (2-Piece Assembly)
• Pipe Shield, Header Shield (shipped attached to top of fireplace)
Additional Items Required
• Gas Line Equipment (shutoff valve, pipe, etc.)
• Electrical Equipment (min. 14 gauge, grounded line)
• The 42PB Requires 7 lbs. of 1/4” Crushed Glass
• The 54PB Requires 8 lbs. of 1/4” Crushed Glass
94500580 Platinum (10 lbs.)
94500581 Bronze (10 lbs.)
94500582 Cobalt (10 lbs.)
94500583 Black (10 lbs.)
Recommended Installation Procedure
• Frame the opening for the fireplace. Make sure to allow for vent installation.
• Install the vent, gas line and electrical hook-up.
• Install the drywall.
• Install the hearth (if applicable).
• Install the facing (if applicable).
• Install the mantel (if applicable).
• Finalize the installation (see page 42).