EasyManua.ls Logo

um CBF 125 - Right Cover Extraction and Installation

um CBF 125
115 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CBF 125 AIR COOLING ENGINE SERVICE MANUAL
RENEGADE SPORT & SCRAMBLER X 125 EFI
57
6.5. Right cover -extraction and installation-
• First drain off oil from engine, remove bolts
from right cover.
• Remove the paper gasket and positioning
pin
• Check the crankshaft oil seal is intact
• Removal of right cover
• Take pushing rod of clutch
• Use tools to dismantle cotter pin on
control arm and take out the spring

Table of Contents