Operating instructions
82 Transporting the machine
11 Lift the A25E/A30E 6x6 by the wheels' lifting eyes.
Lift the A25E 4x4 by the front wheels' lifting eyes and by the
lifting eyes on the back of the dump body.
12 Lower the machine.
13 Disconnect the steering joint lock before operating the
machine, see page 79.
WARNING!
A25E, A30E 6x6
The lifting slings between the lift hook and the wheel's
lifting eyes must be at least 8.5 metres long, and all four
slings must be of the same length.
A25E 4x4
The lifting slings between the lift hook and the wheels'
lifting eyes, as well as between the lift hook and the dump
body's eyes, must be 6.5 metres (±0.5 metre), and all four
must be of the same length.
1015332
6,5m 0,5m
+
-
Lifting A25E 4x4
Lifting A25E 6x6