EasyManua.ls Logo

Wacker Neuson Dumper 6001 - Putting the machine into operation

Wacker Neuson Dumper 6001
130 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-8 BA 5001-6001 US – Edition 1.2 * 6001b320.fm
Operation
3.4 Putting the machine into operation
Safety instructions
Use footholds and handles 28 to access and leave the machine
Never use control elements as handles
Never get on or off a moving machine! Never jump off the machine
Putting the machine into operation for the first time
Important information
The machine may be put into operation by authorized staff only
see chapter 2.5 Staff Qualifications and Basic Responsibilities on page 2-4 and
see chapter 2.6 Safety instructions regarding operation on page 2-4 of this Operator's
Manual.
The staff must have read and understood this Operator's Manual before putting the
machine into operation.
The machine may only be used in serviceable condition in accordance with its
designated use and the instructions set forth in the Operator's Manual, and only by
safety-conscious persons who are fully aware of the risks involved in operating the
machine.
Go through the “Start-up” checklist in the following chapter.
Running-in period
Handle the machine carefully during its first 50 operating hours.
The future performance and service life of the machine are heavily dependent on the
observance of the following recommendations during the running-in period.
Do not overload the machine, but at the same time do not drive too cautiously either, as
the machine will never reach its proper operating temperature.
Do not run the engine at high rpm for extended periods.
Increase the load gradually while varying the engine speed.
Strictly observe the maintenance schedules in the appendix see chapter 5.14
Maintenance plan (overview) on page 5-35

Table of Contents

Related product manuals