EasyManuals Logo

Wacker Neuson Dumper 6001 User Manual

Wacker Neuson Dumper 6001
130 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #47 background imageLoading...
Page #47 background image
BA 5001-6001 US – Edition 1.2 * 6001b330.fm 3-15
Operation
Procedure
After you have completed the starting preparations:
Insert the starter key into the preheating/start switch 15.
Turn the starter key to position “1”
Check whether the following indicators come on:
Indicator 8 for engine oil pressure.
Indicator 6 for alternator charge function.
Replace defective indicators immediately.
Turn the starter key to position “2” and hold it in this position until the preheating
indicator goes out.
Turn the starter key to position “3” and hold it in this position until the engine starts.
If the engine does not start after 10 seconds.
Interrupt the start procedure and try again after 1 minute.
If the engine still does not start after the second try.
Contact a Wacker Neuson service facility for troubleshooting.
As soon as the engine runs:
Release the starter key.
When the engine runs smoothly (increased engine speed):
Important
In general, a battery delivers less energy in cold conditions. Therefore make
sure the battery is always well charged.
1
0
2
3
Fig. 27: Preheating start switch
15
Fig. 28: indicators
8
3

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson Dumper 6001 and is the answer not in the manual?

Wacker Neuson Dumper 6001 Specifications

General IconGeneral
BrandWacker Neuson
ModelDumper 6001
CategoryConstruction Equipment
LanguageEnglish

Related product manuals