EasyManua.ls Logo

Waters 1525M - Chapter 3 Preparing for Operation; 3.1 Powering On and Selecting the Pump; 3.2 Preparing the Pump

Waters 1525M
111 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Powering On and Selecting the Pump 46
3
Chapter 3
Preparing for Operation
This chapter describes how to do the following:
1. Power on the 1525µ or 1525EF Pump and select it in MassLynx.
2. Prepare the 1525µ or 1525EF Pump.
3. Power off the 1525µ or 1525EF Pump.
3.1 Powering On and Selecting the Pump
1. Make sure the pump is installed according to the instructions in Chapter 2.
2. To power on the pump, find the power switch on the left side panel, and set it to the
1 (ON) position.
Note:
Power on the pump and other chromatographic system devices before
powering on the MassLynx workstation.
3. Power on the MassLynx workstation and log on to Windows
®
.
4. Select Start > Programs > MassLynx > MassLynx V4.0. The MassLynx Main
window appears.
5. Click the Inlet Method button (left side of the window) to open the Inlet Editor.
6. Select Tools > Instrument Configuration. The Inlet Configuration page opens.
7. Click Configure.
8. Follow the Inlet Configuration wizard to select the 1525µ or 1525EF Pump.
9. Select the proper head size for the pump (50, 100, or 225 µL).
3.2 Preparing the Pump
Overview
The procedures for preparing the pump for operation depend on the status of the
chromatography system, as indicated in Table 3-1
. Use this table to determine when to
perform certain preparation procedures.

Table of Contents

Related product manuals