EasyManua.ls Logo

ABB A135-M65 - Table 12 Parameters for Wet Cleaning of

ABB A135-M65
154 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Manual / 4 Product description / A130-M.. - A145-M..
6
Periodic maintenanc
e work Page 49 /
121
© Copyright 2017 ABB. All rights reserved.
HZTL4031_EN
Revision E
January 2017
6.2.5 Carrying out wet cleaning of the compressor
Figure 22: Carrying out wet cleaning of compressor
Engine load
Filling amount of water pressure
vessel [dm
3
]
Water temperature [°C]
Water injection period
[s]
5085 % 0.4 5 … 30 10
Table 12: Parameters for wet cleaning of compressor
Remove sealing plug (27005).
Fill container with 0.4 dm
3
of pure water.
Screw in sealing plug (27005) again.
Push the valve activator (03) against the spring and hold for 1015 seconds until the
entire volume of water is injected.
Continue to operate the engine for at least five minutes to ensure that all of the water is
flushed out of the system.
Not more than three cleaning cycles should be conducted consecutively. Before repeating the
process, continue to operate the engine for at least five minutes to ensure that all of the water
is flushed out of the system.

Table of Contents

Related product manuals