14 EN - Quick installation and start-up guide
EN
ES
FI
FR
IT
PL
PT
RU
SV
TR
ZH
9. Twist the motor cable shield into a bundle and put yellow-green insulation tape on
it, fit a cable lug, and connect it to the grounding terminal. See figure below.
10. Connect the phase conductors of the motor cable to the terminals of T1/U, T2/V
and T3/W. See figure below. Tighten the screws to the torque given in table below.
Frame R8 only
:
If you connect only one conductor to the connector, we recommend that you
put it under the upper pressure plate.
The connectors are detachable but we do not recommend that you detach
them. If you do, detach and reinstall the connectors as follows.
11. Strip the power cable.
12. Ground the motor cable shield under the grounding clamp.
13. Twist the motor cable shield into a bundle and put yellow-green insulation tape on
it, fit a cable lug, and connect it to the grounding terminal.
14. Connect the phase conductors of the power cable to the terminals of L1, L2 and
L3. Tighten the screws to the torque given. See step 10.
Frame Tightening torque in Nm (lbf·ft)
T1/U, T2/V, T3/W, L1, L2, L3 PE,
R5 5.6 (4.1) 2.2 (1.6)
R6 30 (22.1) 9.8 (7.2)
R7, R8 40 (29.5)
10
9
7
7
13
14