ETL600 System Test Report
_ EN B3/B11
HE
Test
No.
Test procedure
Test point
Permissible
value
Units
Test
result
B.6.5 Link alarm indication
Activate link alarm by interrupting RF
connection.
Link alarm LED on P4LT LED to be ON [ ]
State of Link alarm relay after
programmed delay.
Terminals 5-6 at V9OT
external cable
Closed [ ]
Deactivate link alarm by restoring the
link.
Link alarm LED on P4LT LED to be OFF [ ]
State of link alarm relay after
programmed delay.
Terminals 5-6 at V9OT
external cable
Open [ ]
B.7 Testing of R1BC, if present
Activate alarms as programmed on
R1BC.
Corresponding N/C
contacts on R1BC.
Closed [ ]
Deactivate alarms as programmed on
R1BC.
Corresponding N/C
contacts on R1BC.
Open [ ]
B.8 Configure Real Time Clock (RTC)
B.8.1 Setting real time clock
Menu: Equipment, Commissioning
and maintenance, Eventrecorder, Set
clock
Download date / time to RTC Dialog box
A
ctual time and
date
[ ]
B.8.2 Testing external real time clock
synchronization (if available)
Menu: Equipment, Commissioning
and maintenance, Eventrecorder, Set
clock
Download date/time to RTC Dialog box Wrong time
Upload date/time from RTC Dialog box Correct time [ ]