NoteAction
xx1000001106
Refit the cover, motor axis 6 with its attach-
ment screws and washers. Make sure the
cabling is placed correctly when refitting
the cover and does not get jammed.
Note
Make sure the cover is tightly sealed!
10
Detailed in section Updating revolution
counters on page 335.
Update the revolution counter!11
DANGER
Make sure all safety requirements are met
when performing the first test run. These
are further detailed in the section DANGER
- First test run may cause injury or damage!
on page 45.
12
170 3HAC039838-001 Revision: C
© Copyright 2013 ABB. All rights reserved.
4 Repair
4.3.2 Replacing the cable harness, upper end (incl. axis 6)
Continued