2.3.5 Lifting the base plate
Required equipment
NoteArt. no.Equipment
3 pcs3HAC14457-4Lifting eye, M16
3 pcsLifting slings
Length: approx. 2 m
Hole configuration
xx0200000096
Attachment holes for lifting eyes (x3)A
Lifting, base plate
NoteAction
CAUTION
The base plate weighs 353 kg! All lifting equipment
used must be sized accordingly!
1
Shown in figure Hole configur-
ation on page 75.
Fit lifting eyes in specified holes.2
Fit lifting slings to the eyes and to the lifting device.3
3HAC039838-001 Revision: C 75
© Copyright 2013 ABB. All rights reserved.
2 Installation and commissioning
2.3.5 Lifting the base plate