EasyManua.ls Logo

ABB IRB 760 - Page 342

ABB IRB 760
364 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
DANGER
There is stored energy built up by high
tensioned compression springs inside the
balancing device! When a coil is cut the
released tension creates a spatter of
sparks and flames.
The working area must be free of flam-
mable materials. Position the balancing
device so that the spatter will be directed
away from personnel.
6
Use a cutting torch with a long shaft.Cut the coils of the springs inside the
housing as specified below:
Outer spring: cut at least five coils!
Outer spring: cut at least eight coils!
Middle spring: cut at least four coils!
Inner spring: cut at least four coils!
Inner spring: cut at least eight coils!
7
Double-check the number of coils cut and
make sure all the tension in the springs is
removed.
8
Cut more coils if there is still tension in the
springs.
342 3HAC039838-001 Revision: C
© Copyright 2013 ABB. All rights reserved.
6 Decommissioning
6.2 Decommissioning of balancing device
Continued

Table of Contents

Related product manuals