EasyManuals Logo

ABB rec670 Applications Manual

ABB rec670
658 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #417 background imageLoading...
Page #417 background image
ANSI10000044-1-en.vsd
L
o
a
d
T
a
p
C
h
a
n
g
e
r
raise,lower
signals/alarms
position
MIM
BOM
IED
TRM
3ph or ph-ph or 1ph Currents
High Voltage Side
Low Voltage Side
Line Impedance R+jX
Load Center
3ph or ph-ph or 1ph Voltages
IA,IB,IC
(Load Current) IL
VL (Load Point Voltage)
VB (Busbar Voltage)
BIM
ANSI10000044 V1 EN-US
Figure 169: Signal flow for a single transformer with voltage control
On the HV side, the three-phase current is normally required in order to feed the three-
phase over current protection that blocks the load tap changer in case of over-current
above harmful levels.
The voltage measurement on the LV-side can be made single phase-ground. However,
it shall be remembered that this can only be used in solidly grounded systems, as the
measured phase-ground voltage can increase with as much as a factor √3 in case of
ground faults in a non-solidly grounded system.
The analog input signals are normally common with other functions in the IED for
example, protection functions.
The LV-busbar voltage is designated V
B
, the load current I
L
and load
point voltage V
L
.
1MRK 511 401-UUS A Section 14
Control
Bay control REC670 2.2 ANSI 411
Application manual

Table of Contents

Other manuals for ABB rec670

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB rec670 and is the answer not in the manual?

ABB rec670 Specifications

General IconGeneral
BrandABB
Modelrec670
CategoryControl Unit
LanguageEnglish

Related product manuals