EasyManua.ls Logo

ABB rec670 - Page 430

ABB rec670
658 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Line voltage drop compensation for parallel control
SEMOD159053-186 v3
The line voltage drop compensation for a single transformer is described in section
"Line voltage drop". The same principle is used for parallel control with the circulating
current method and with the master – follower method, except that the total load
current, I
L
, is used in the calculation instead of the individual transformer current. (See
figure 172 for details). The same values for the parameters Rline and Xline shall be set
in all IEDs in the same parallel group. There is no automatic change of these
parameters due to changes in the substation topology, thus they should be changed
manually if needed.
Avoidance of simultaneous tapping
SEMOD159053-189 v1
Avoidance of simultaneous tapping (operation with the circulating current
method)
SEMOD159053-191 v3
For some types of tap changers, especially older designs, an unexpected interruption of
the auxiliary voltage in the middle of a tap manoeuvre, can jam the tap changer
. In
order not to expose more than one tap changer at a time, simultaneous tapping of
parallel transformers (regulated with the circulating current method) can be avoided.
This is done by setting parameter OperSimTap to On. Simultaneous tapping is then
avoided at the same time as tapping actions (in the long term) are distributed evenly
amongst the parallel transformers.
The algorithm in Automatic voltage control for tap changer, parallel control TR8ATCC
(90) will select the transformer with the greatest voltage deviation V
di
to tap first. That
transformer will then start timing, and after time delay t1 the appropriate VRAISE or
VLOWER command will be initiated. If now further tapping is required to bring the
busbar voltage inside VDeadbandInner, the process will be repeated, and the
transformer with the then greatest value of V
di
amongst the remaining transformers in
the group will tap after a further time delay t2, and so on. This is made possible as the
calculation of I
cc
is cyclically updated with the most recent measured values. If two
transformers have equal magnitude of V
di
then there is a predetermined order
governing which one is going to tap first.
Avoidance of simultaneous tapping (operation with the master follower method)
SEMOD159053-197 v2
A time delay for the follower in relation to the command given from the master can be
set when the setting MFMode is Follow Tap that is, when the follower follows the tap
position (with or without an offset) of the master. The setting parameter tAutoMSF then
introduces a time delay on VRAISE/VLOWER commands individually for each
follower, and effectively this can be used to avoid simultaneous tapping.
Homing
SEMOD159053-200 v2
Homing (operation with the circulating current method)
SEMOD159053-205 v3
This function can be used with parallel operation of power transformers using the
circulating current method. It makes possible to keep a transformer energized from the
Section 14 1MRK 511 401-UUS A
Control
424 Bay control REC670 2.2 ANSI
Application manual

Table of Contents

Other manuals for ABB rec670

Related product manuals