EasyManua.ls Logo

ABB REG650 - Measurement Principle; Time Delay

ABB REG650
728 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
U UBase kV< (%) ( )
3
EQUATION1429 V2 EN (Equation 75)
and operation for phase-to-phase voltage under:
U (%) UBase(kV)< ×
EQUATION1990 V1 EN (Equation 76)
When phase-to-earth voltage measurement is selected the function
automatically introduces division of the base value by the square root
of three.
9.1.7.1 Measurement principle
Depending on the set ConnType value, UV2PTUV measures phase-to-earth or phase-
to-phase voltages and compare against set values, U1< and U2<. The parameters
OpMode1 and OpMode2 influence the requirements to activate the START outputs.
Either 1 out of 3, 2 out of 3, or 3 out of 3 measured voltages have to be lower than the
corresponding set point to issue the corresponding START signal.
To avoid oscillations of the output START signal, a hysteresis has been included.
9.1.7.2 Time delay
The time delay for step 1 can be either definite time delay (DT) or inverse time delay
(IDMT). Step 2 is always definite time delay (DT). For the inverse time delay two
different modes are available; inverse curve A and inverse curve B.
The type A curve is described as:
n
n
k
t
U U
U
=
æ ö
< -
ç ÷
<
è ø
EQUATION1431 V2 EN
(Equation 77)
The type B curve is described as:
n
n
k
t
U U
U
2.0
480
0.055
32 0.5
×
= +
æ ö
< -
× -
ç ÷
<
è ø
EQUATION1432 V2 EN
(Equation 78)
Section 9 1MRK 502 048-UEN A
Voltage protection
260
Technical manual

Table of Contents

Other manuals for ABB REG650

Related product manuals