11.5.9.2 Checking the phase current trip value, Pickup_PH
M12104-23 v14
The check of the Pickup_PH current level is best made in FunctionMode = Current and BuTripMode = 1
out of 3 or 2 out of 4.
1. Apply the fault condition, including BFI_3P of CCRBRF (50BF), with a current below set
Pickup_PH.
2. Repeat the fault condition and increase the current in steps until a trip occurs. Note that the
INITIATE signal shall be re-applied for each new current value.
3. Compare the result with the set Pickup_PH.
If RetripMode = Off and FunctionMode = Current is set, only backup trip can be used to
check set Pickup_PH.
11.5.9.3 Checking the residual (ground fault) current trip value Pickup_N set below
Pickup_PH
M12104-80 v10
Check the low set Pickup_N current where setting FunctionMode = Current and setting BuTripMode = 1
out of 4
1. Apply the fault condition, including BFI_3P of CCRBRF (50BF), with a current just below set
Pickup_N.
2. Repeat the fault condition and increase the current in steps until trip appears. Note that the
INITIATE signal shall be re-applied for each new current value.
3. Compare the result with the set Pickup_N.
4. Disconnect AC and BFI_3P input signals.
11.5.9.4 Checking the re-trip and back-up times
M12104-93 v12
The check of the set times can be made in connection with the check of trip values above.
Choose the applicable function and trip mode, such as FunctionMode = Current and RetripMode =
UseFunctionMode.
1. Apply the fault condition, including initiation of CCRBRF (50BF), well above the set current value.
Measure time from BFI_3P of CCRBRF (50BF).
2. Check the re-trip t1 and back-up trip times t2 and t3.
In applicable cases, the back-up trip for multi-phase pickupt2MPh and back-up trip 2, t2 and t3 can
also be checked. To check t2MPh, a two-phase or three-phase initiation shall be applied.
3. Disconnect AC and BFI_3P input signals.
11.5.9.5 Verifying the re-trip mode
M12104-36 v6
Choose the mode below, which corresponds to the actual case.
In the cases below it is assumed that FunctionMode = Current is selected.
Checking the case without re-trip, RetripMode = Off
M12104-107 v8
1MRK 504 165-UUS Rev. J Section 11
Testing functionality by secondary injection
Transformer protection RET670 181
Commissioning manual
© 2017 - 2021 Hitachi Power Grids. All rights reserved

Table of Contents

Other manuals for ABB Relion 670 series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB Relion 670 series and is the answer not in the manual?

ABB Relion 670 series Specifications

General IconGeneral
BrandABB
ModelRelion 670 series
CategoryProtection Device
LanguageEnglish

Related product manuals