in % for single-phase-to-ground faults with mutual zero sequence current.
Where:
p = the expected value of a distance to fault in percent
Z
x
= set test point on the test set
X0 = set zero-sequence reactance of a line
X1 = set positive-sequence reactance of a line
XM = set mutual zero-sequence impedance of a line
11.14.14.4 Completing the test
M14955-84 v6
Continue to test another function or end the test by changing the TESTMODE setting to Disabled.
Restore connections and settings to the original values, if changed for testing purposes.
11.15 Metering
SEMOD53588-1 v1
11.15.1 Pulse-counter logic PCFCNT
M13405-2 v7
The test of the Pulse-counter logic function PCFCNT requires the Parameter Setting tool in PCM600 or
an appropriate connection to the local HMI with the necessary functionality. A known number of pulses
with different frequencies are connected to the pulse counter input. The test should be performed with
settings Operation = Enable or Operation = Disable and the function blocked or unblocked. The pulse
counter value is then checked in PCM600 or on the local HMI.
11.15.2 Function for energy calculation and demand handling ETPMMTR
GUID-4FC03017-93BD-4B30-A874-487BF89971D5 v1
Prepare the IED for verification of settings as outlined in section ”Overview “ and section ”Preparing for
test“ in this chapter.
11.15.2.1 Verifying the settings
GUID-F8F0D384-BC70-48CA-817E-EB9BFBD68A54 v3
Common test equipment can be used to determine the injection of current and voltage and time
measurement.
Verification of EAFACC & ERFACC output
1. Connect the test set for injection of three-phase currents and three-phase voltage to the appropriate
current and voltage terminals of the IED.
2. Ensure the instantaneous values of active and reactive power from CVMMXN function block are
connected to ETPMMTR function block active and reactive power inputs.
3. Enable the EnaAcc setting and set tEnergy as 1 minute.
4. Activate the STARTACC input and supply the IED with three-phase currents and voltages at their
rated value.
5. Check that the ACCINPRG signal appears continuously.
6. Note the EAFACC and ERFACCvalue after 1 minute and compare it with calculated energy value.
7. Similarly check after each 1 minute whether the calculated integrated energy value and EAFACC
and ERFACC outputs are matching.
Section 11 1MRK 504 165-UUS Rev. J
Testing functionality by secondary injection
288 Transformer protection RET670
Commissioning manual
© 2017 - 2021 Hitachi Power Grids. All rights reserved