Working
11
11.1 Spreading fertiliser
1
Shutter open
2
Shutter closed
CMS-I-00006176
REQUIREMENTS
The implement is configured
The product data is entered
The product is selected
The weighing method for determining the
calibration factor is selected
Alternative: Determine the calibration factor at
a standstill before operation
1. Call up the "Work" menu.
2. Drive onto the field.
3. Run the spreading discs at the nominal speed.
4. If the "Manual" weighing method is selected,
start the calibration run, see page 32.
5. When the switch-on point according to the
setting chart has been reached,
open the shutter.
CMS-T-00008274-B.1
CMS-T-00008257-B.1
11 | Working
MG7387-EN-II | B.1 | 12.01.2022
31

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Amazone AmaSpread 2 and is the answer not in the manual?

Amazone AmaSpread 2 Specifications

General IconGeneral
BrandAmazone
ModelAmaSpread 2
CategoryFarm Equipment
LanguageEnglish

Related product manuals