EasyManua.ls Logo

Andritz MC - Start-Up Procedures for the Pump; Start-Up Safety and Prerequisites

Andritz MC
106 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Medium-consistency pump MC
STANDARD, C-01-000000
Rev. 0, 2010.02.09 START-UP Kap.5 , Seite 1 of 8
GRZ-2698571-v1-Startup.FM
5START-UP
5.1 General
Initial start-up of the medium-consistency pump shall be prepared and
carried out by the Contractor or by ANDRITZ AG personnel. Start-up
takes place in accordance with the start-up sequence plan and ANDRITZ
AG's start-up routines.
5.2 Safety regulations
General safety
instructions
Start-up shall be supervised by ANDRITZ AG's start-up manager or by the
buyer.
All applicable accident prevention rules must be observed.
Qualification of
personnel
assigned
Start-up may only be carried out by skilled workers with the appropriate
training.
Personal
protective apparel
The following protective equipment must be worn when carrying out
start-up and erection work:
Hard hat
Protective shoes
Goggles
Gloves must be worn when handling aggressive media (oil, cleaning
agent, chemicals, lubricants, white water, etc.).
During start-up, practical training will also be provided on the machine.
Participants must receive instruction on the theory beforehand.
DANGER
Disregarding the safety regulations may cause a risk to life and limb.
If safety regulations are disregarded, this may cause a risk to life
and limb and damage to the machine or its components.
All safety instructions in this section must be strictly observed.

Related product manuals