Medium-consistency pump MC
STANDARD, C-01-000000
Rev. 0, 2010.02.09 MAINTENANCE Kap.7 , Seite 4 of 22
GRZ-2698573-v1-Maintenance.FM
7.4 Maintenance schedule
In addition to the work outlined below, personnel must also carry out
maintenance and work required for normal operations
/MEDIUM CONSISTENCY PUMP MC/ OPERATION/ NORMAL
OPERATION).
Monthly The following maintenance work is to be carried out at monthly intervals.
6-monthly The following maintenance work is to be carried out at 6-monthly
intervals.
Annually The following maintenance work is to be carried out at annual intervals.
Component Activity
Bearings
Check temperature
Vibration measurements
Check oil level
Check for strange noises
Shaft with bearing
Check for smooth running
Coupling
Check alignment
Check pads for wear
Mechanical seal
Check for leaks
Check for wear
Pipework
Check for leaks
Complete pump
Check for leaks
Clean
Tab. 7-2 Monthly maintenance work
Component Activity
Complete pump
Check mounting of pump on the
foundation
Motor
Check mounting of motor on the
foundation
Tab. 7-3 6-monthly maintenance work
Component Activity
Complete pump
Complete service according to instructions
from Andritz AG
(Oil change, impeller and
fluidisator check, etc.)
Tab. 7-4 Annual maintenance work