Medium-consistency pump MC
STANDARD, C-01-000000
Rev. 0, 2010.02.09 MAINTENANCE Kap.7 , Seite 4 of 22
GRZ-2698573-v1-Maintenance.FM
7.4 Maintenance schedule
In addition to the work outlined below, personnel must also carry out
maintenance and work required for normal operations
/MEDIUM CONSISTENCY PUMP MC/ OPERATION/ NORMAL
OPERATION).
Monthly The following maintenance work is to be carried out at monthly intervals.
6-monthly The following maintenance work is to be carried out at 6-monthly
intervals.
Annually The following maintenance work is to be carried out at annual intervals.
Component Activity
Bearings
• Check temperature
• Vibration measurements
• Check oil level
• Check for strange noises
Shaft with bearing
• Check for smooth running
Coupling
• Check alignment
• Check pads for wear
Mechanical seal
• Check for leaks
• Check for wear
Pipework
• Check for leaks
Complete pump
• Check for leaks
• Clean
Tab. 7-2 Monthly maintenance work
Component Activity
Complete pump
• Check mounting of pump on the
foundation
Motor
• Check mounting of motor on the
foundation
Tab. 7-3 6-monthly maintenance work
Component Activity
Complete pump
• Complete service according to instructions
from Andritz AG
(Oil change, impeller and
fluidisator check, etc.)
Tab. 7-4 Annual maintenance work