EasyManua.ls Logo

Atlas Copco GA 45+ - Page 132

Atlas Copco GA 45+
186 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Initial start procedure
If the compressor has not run for the past 6 months, it is strongly recommended to
improve the lubrication of the compressor element before starting.
To do so:
1. Disconnect the inlet hose.
2. Remove the unloader (UA).
3. Pour approximately 0.75 l (0.20 US gal, 0.17 Imp gal) of compressor oil into the
compressor element inlet. For oil specifications, see section Oil specifications.
4. Reinstall the unloader and reconnect the inlet hose.
Make sure that all connections are tight.
Location of unloader
1. Check the oil level before starting.
The oil level should be between the oil filler neck (FC) and the top of the sight glass (Gl).
Instruction book
130 2920 7109 51

Table of Contents

Related product manuals