EasyManua.ls Logo

Avantik QS12 - Operation; Switching On

Avantik QS12
59 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 4 --- Operation
4- Operation
Switching On
Before switching on the instrument for the first time, ensure that the power requirements indicated
o
n the rating label correspond to the power supply voltage being tested.
N
ote
No other instruments should be connected to the circuit used for the QS12, as the compressor needs high surge currents when
started.
Do not use multi-socket power outlets with small wire sizes for the supply of the instrument.
Insert the supplied power cord into the power socket and then connect the power cord to the mains supply.
Install the blade holder if necessary.
Close the heated window.
Turn on the power switch.
N
ote
e default setting of the specimen head temperature is -20°C.
e cooling phase will take approximately 2 to 3.5 hours depending on the set chamber temperature and Ambient
temperature.

Table of Contents