EasyManua.ls Logo

Baldwin Boxall OmniCare - Page 5

Default Icon
102 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OmniCare EVC System
Installation & Commissioning Manual
OmniCare issue 1
v
C
O
M
M
U
N
I
C
A
T
I
O
N
S
Re-addressing Remote Units ____________________________ 67
Fault Finding
Fault Finding Remote Units during Commissioning - Overview ___ 69
Description of 0V Continuity Check - - - - - - - - - - - - - - - - - - 70
Check Terminations on Remote Units - - - - - - - - - - - - - - - - - 70
Description of Loop Integrity Check (Power Cables) - - - - - - - - - - 71
Testing Loop Integrity (Data Cables) & Diagnosing Fault Location - - - - 72
Fault Finding Procedures for Remote Units _________________ 73
Perform a 0V Continuity Check - - - - - - - - - - - - - - - - - - - - 73
Check Terminations on Remote Units - - - - - - - - - - - - - - - - - 73
Test the Loop Integrity (Power Cables) - - - - - - - - - - - - - - - - 74
Diagnosing the Location of Fault(s) using Commissioning Process - - - - 75
Diagnosing the Location of Fault(s) using the “System OK” LEDs- - - - - 78
Remote Units not found when Cabling appears Correct - - - - - - - - - 79
System Reset and System Configuration - - - - - - - - - - - - - - - - 79
Fault Finding - Normal Operation ________________________ 80
Remote Unit Fault Indication - - - - - - - - - - - - - - - - - - - - - 80
System Fault LEDs - - - - - - - - - - - - - - - - - - - - - - - - - - 81
“SYSTEM OK” Indicators on Remote Units - - - - - - - - - - - - - - 81
Fault Finding - Battery Charger __________________________ 82
Battery Charger Normal Operation - - - - - - - - - - - - - - - - - - 82
Battery Condition Monitoring- - - - - - - - - - - - - - - - - - - - - 83
Maintenance
Appointment of a “Responsible Person” ___________________ 85
Routine Testing _____________________________________ 86
Daily Check - Fault Indicators - - - - - - - - - - - - - - - - - - - - - 86
Weekly Functional Test - - - - - - - - - - - - - - - - - - - - - - - 86
Six Monthly Inspection by a “Competent Person”- - - - - - - - - - - - 86
Addendum
Maximum Cable Lengths and Resistance values ______________ 87
Approximate Cable Length Calculations____________________ 88
Distance Between Two Remote Units - - - - - - - - - - - - - - - - - 88
Readings with Local Unit Disconnected - - - - - - - - - - - - - - - - 89

Table of Contents