Do you have a question about the Barco X8 and is the answer not in the manual?
Details on personal protection, installation personnel, and general safety notices.
Key instructions for safe operation, cleaning, and maintenance of the X8 display.
Critical warnings regarding electric shock, temperature, surge protection, and material handling.
Guidelines for handling, environmental conditions, and correct application of X8 display tiles.
Safety precautions for stacking and transporting X8 rental flight cases.
Specifies weight, level surface, and ballast needs for X8 rental display installation.
Details power requirements, grounding, and disconnect device specifications.
Outlines minimum and recommended hardware/software specs for the control software.
Explains the fundamental elements of an X8 rental display system.
Details the structure, locking mechanisms, and positioning features of the rental frame.
Describes the LED module, its positioning pins, latches, and connection ports.
Explains the function, ports, and orientation of the X8 Connection Box.
Covers foot beams, rental feet, and stacker systems for floor mount configurations.
Details X8 single and dual truss beams for hanging configurations.
Information on flight cases for rental tiles, truss beams, and rental feet.
Overview of the video processor used as a front-end for Barco LED products.
Description of various power distribution solutions for the X8 display.
Details on the Director Toolset for controlling and configuring the display.
Information on fiber optic connections for long-distance signal transmission.
Step-by-step guide for assembling base stands and installing tiles for floor mounting.
Procedures for installing truss beams and hanging X8 tiles for aerial configurations.
Instructions for attaching and adjusting feet for leveling the display.
Steps for assembling rental feet onto foot beams for display support.
Procedure for mounting X8 rental tiles onto the rental foot assembly.
Guide for connecting X8 rental tiles to each other and the main display.
Steps for attaching the stacker system for vertical tile configuration.
Procedure for attaching truss beams to X8 rental tiles for hanging.
Details on connecting power boxes and power linking cables for the display.
Instructions for connecting data linking cables between digitizer and connection boxes.
Diagram and explanation for connecting X8 Connection Boxes to X8 Modules.
Procedure and tools for cleaning the X8 tiles to maintain brightness.
Explanation of boot-loader diagnostics for the X8 Connection Box.
Step-by-step guide for removing and installing an X8 Connection Box.
Instructions for safely removing and installing an X8 LED module.
Information on obtaining and installing the latest software and firmware.
Technical drawings and measurements for the X8 LED module.
Technical drawings and measurements for the X8 Connection Box.
Technical drawings and measurements for the X8 rental frame.
Technical drawings and measurements for the X8 single truss beam.
Technical drawings and measurements for the X8 dual truss beam.
Technical drawings and measurements for the X8 rental foot with stacker.
Technical drawings and measurements for the X8 rental tile flight case.
Technical drawings and measurements for the X8 display foot beams.
Detailed technical specifications for the X8 Rental Tile.
List of weights for various components of the X8 rental display.
List of order codes and descriptions for spare parts and accessories.
Information on proper disposal of waste electrical and electronic equipment.
Details on hazardous substances and compliance with Chinese Mainland RoHS standards.
Factory location information for Barco NV.