2. Installation requirements
2. INSTALLATION REQUIREMENTS
About this chapter
This chapter enumerates the mechanical requirements for the X8 display, the electrical requirements to power up the X8 display and
the system requirements to run the control software efficiently.
Overview
• Mechanical requirements for the X8 rental display
• Electrical requirements for the X8 rental display
• System requirements for the Director toolset
R5905160 X8 RENTAL DISPLAY 25/02/2013
11