PL-6000DC/DCX Two-Post Parking Lift 14 P/N 5900273Rev. A6 —July 2024
Installation Checklist
Following are the steps needed to install a PL-6000DC/DCX Lift. Perform them in the order shown.
1. Review the installation Safety rules.
2. Make sure you have the necessary Tools.
3. Plan for electrical work.
4. Select the installation Location.
5. Checking clearances.
6. Unload and unpack the Lift Components.
7. Review the installation orientation.
8. Create Chalk Line Guides for the Posts.
9. Move and Prepare the Lift Posts.
10. Anchoring the Powerside Post.
11. Attach the Side Beams, Back Plate and Connection Rods.
12. Route and attach the Balance Chain.
13. Connecting the Safety Lock Release Lift Carriages.
14. Installing the Lift Cylinder and Lift Chain.
15. Install the Power Unit.
16. About Thread Sealants.
17. Install the Safety Lock Release Angle.
18. Installing the Control Arm.
19. Connect the Safety Lock Release Cable.
20. Installing the Lift Platform Plates and Ramp.
21. Contact an Electrician.
22. Install the Safety Lock Release Angle.
23. Install the Power Disconnect and Thermal Disconnect (if required). (Electrician Required).
24. Connect to Power (Electrician Required).
25. Wire the Junction Box (Electrician Required).
26. First Operational Test and Level Adjustment.
27. Adjusting the Safety Locks and Safety Release.
28. Adjusting the Limit Switch.
29. Drill the Offside Post Anchors and Attach the Front Supports.
30. Lubricate the Lift.
31. Perform an Operational Test.
32. Review the Final Checklist.
33. Leave the Manual for the Lift Owner/Operator.