EasyManua.ls Logo

Berthold LB 444 - Page 4

Default Icon
112 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Density Meter LB 444 List of Figures
iv
List of Figures
Page
Figure 1: Principle of measurement .................................................................................... 4
Figure 2: Measuring system mounted on a straight pipeline .............................................. 5
Figure 3: Installation on a U-shaped measuring path ......................................................... 6
Figure 4: Shielding container type LB744 ........................................................................... 8
Figure 5: Shielding for installation in a container ................................................................ 9
Figure 6: Shutter switch for ex-protected area..................................................................10
Figure 7: Scintillation counter............................................................................................ 11
Figure 8: Front Panel LB 444............................................................................................ 12
Figure 9: Softkeys functions.............................................................................................. 13
Figure 10: Live display ...................................................................................................... 13
Figure 11: Diagram illustrating the hysteresis................................................................... 19
Figure 12: Installation on a horizontal pipeline.................................................................. 27
Figure 13: Outdoor installation .......................................................................................... 28
Figure 14: Installation on S or U-shaped measuring path................................................. 29
Figure 15: External installation with shielding and detector.............................................. 30
Figure 16: Installation in a container ................................................................................. 31
Figure 17: Installation in a container with horizontal flow.................................................. 32
Figure 18: Installation in a container with vertical flow...................................................... 32
Figure 19: Installation of water-cooling ............................................................................. 33
Figure 20: Required amount of water-cooling................................................................... 34
Figure 21: Cable connections at detector ......................................................................... 36
Figure 22: Terminal connection evaluation unit (rear panel)............................................. 37
Figure 23: Rear view of shielding container type LB 744.................................................. 40
Figure 24: Locking mechanism with knurled nut............................................................... 41
Figure 25: Locking mechanism with spring pin ................................................................. 42
Figure 26: Influence of absorption coefficients on one-point calibration...........................63
Figure 27: One-point calibration with additional calibration points.................................... 63
Figure 28: Example of multi-point calibration.................................................................... 64
Figure 29: Response......................................................................................................... 70
Figure 30: Source holder................................................................................................... 86

Table of Contents

Related product manuals