36 support@cedarsummitplay.com
Step 18: Chalk Wall Frame Assembly
Hardware
Front
Back
Wood Parts
A:Onthebackoftheassembly,tighttothebottomof(1906)TopFrontBack,attach(1944)PanelFrameto(1931)
Postusing2(S2)#8x1-1/2”WoodScrews.(g.18.1and18.2)
B:Place(1227)CEWallBoardtighttothetopof(1894)BackFloorandushtotheedgeof(1931)Postand
(2033)MKMount.Attachtopostusing2(S2)#8x1-1/2”WoodScrews.(g.18.2)
Fig. 18.2
1944
Fig. 18.1
1894
1227
2033
S2
S2
S2
1931
1906
Notebevelededge
facesinside
4 x #8 x 1-1/2” Wood Screw
1 x Panel Frame 1 x 2 x 24-3/8”
1 x CE Wall Board 1 x 4 x 20”
1944
S2
1227