42 support@cedarsummitplay.com
1943
1565
Hardware
Other Parts
Step 24: Connect Monkey Bar Assembly to Fort
Pre-drill all pilot holes using a 1/8” drill bit before installing the lag screws.
2 x #8 x 1-1/2” Wood Screw
6 x #12 x 1” Pan Screw
1 x 5/16 x 3” Hex Bolt (5/16” lock washer, 5/16” at washer, 5/16” t-nut)
1 x 1/4 x 2-1/2” Lag Screw (1/4” at washer)
1 x MB Mount Strap
1 x MK Bracket
S6
Fig. 24.2
Fig. 24.3
21-1/2”
LS2
G10
A:WithaMKBracketattach(1565)MKRailShortto(2033)MKMountwith1(G10)5/16x3”HexBolt(withlock
washer,atwasherandt-nut)and4(S6)#12x1”PanScrews,asshowning.24.1and24.2.
B:Measure21-1/2”fromtopof(1943)MKRailLongtotopof(1890)CEGapBoard,thenwithaMBMountStrap
attach(1943)MKRailLongto(1931)Postusing1(LS2)1/4x2-1/2”LagScrew(withatwasher)inthecentre
holeand2(S6)#12x1”PanScrewsinthe2endholesasshowning.24.3.
C:Tightenthetopboltin(2033)MKMount.
D:Makesure(1227)CEWallBoard,fromStep18istighttotheoorboards,thenattachto(2033)MKMount
using2(S2)#8x1-1/2”WoodScrews.(g.24.4and24.5)
S2
5/16”Flat
Washer
5/16”Lock
Washer
5/16”
T-Nut
G10
2033
S6
x4
MKBracket
1565
LS2
S6
MBMountStrap
1943
1890
S6
1931
1/4”Flat
Washer
Fig. 24.5
Fig. 24.4
2033
S2
1227
Fig. 24.1