MK / MKT (E5) 03/2019 page 24/158
Protect both ends of the hose with two of the four supplied hose clamps. Before turning on the cham-
ber, check the connection for leaks.
Water consumption:
The average water demand is not helpful for the design of the water supply line, since the supply line must
provide sufficient dimensions for peak loads.
Peak values occur briefly (<5 min) when temperature rapidly decreases from + 180 ° C to a much lower
value. Also the activation of the condensation protection leads to high water consumption.
Max. water flow rate (peak value):
MK 56: approx. 0,6 m³/h
4.3 Installation of the voltage and frequency changer
(chambers with voltage and frequency changer)
The voltage and frequency changer is supplied packed separately together with the chamber.
CAUTION
Sliding or tilting of the voltage and frequency changer.
Damage to the voltage and frequency changer.
Risk of injury by lifting heavy loads.
Do NOT lift the voltage and frequency changer by hand.
Lift the voltage and frequency changer from the pallet using technical devices (fork
lifter). Set the fork lifter only from the rear in the middle of the chamber.
Alternatively, the voltage and frequency changer can also be lifted at the eyelets on the
top by means of a lifting crane or fork lifter