up it. If the symptom persists, please contact
BLUETTI support team.
18.
PV2 Overcurrent
19.
20.
PV1 Voltage High
Check if the total voltage of solar panels exceeds
the limit. Reduce the number of solar panels and
the inverter resumes operation after calibration.
21.
PV2 Voltage High
22.
23.
PV1 ISO Failure
Check the insulation resistor between solar array and
grounding for a short circuit.
24.
PV2 ISO Failure
25.
26.
Hardware PV1 Failure
27.
Hardware PV2 Failure
28.
29.
GFCI Hardware Circuit
Failure
Turn off the inverter and wait 30 minutes to restart
up it. If the symptom persists, please contact
BLUETTI support team.
30.
GFCI Failure
Check if the AC output PE wire is grounded.
31.
Phase Sequence Error
Check if the grid connection meets installation
requirements.
32.
Fan Failure
Check if the inverter fan operates well.
33.
Zero Drift Anomaly
Turn off the inverter and wait 30 minutes to restart
up it. If the symptom persists, please contact
BLUETTI support team.
34.
Hardware Input Overcurrent
35.
DC Input Voltage Low
Check if the DC voltage is too low.
36.
DC Input Voltage High
Check if the DC voltage is inconsistent with the battery
specifications.
37.
DC Input Overcurrent
38.
LLC Output Overvoltage
Turn off the inverter and wait 30 minutes to restart
up it. If the symptom persists, please contact
BLUETTI support team.
39.
40.
Inverter Overload
Check if the inverter is overloaded.