EP600 Energy Storage System User Manual
Before operating any maintenance, the electrical connection between the Energy
Storage System and the grid must be disconnected first, then disconnect the
electrical connection between inverter and PV
、
battery pack. Wait for at least 30
minutes until the internal components are discharge completely then the
maintenance can be operated.
In the process of maintenance, please observe the precaution of anti-
static,wear anti-static gloves.
If any maintenance is required, please contact the local authorized
maintenance center. During the maintenance, please try to avoid irrelevant
personnel from entering the maintenance site, temporary warning signs or
fences must be erected for isolation.
The label of Energy Storage System
There are some symbol related safety on the Energy Storage System’s label . Please carefully read and fully
understand the content of these labels before installing the Energy Storage System.
Figure 1-1 Safety label
There still exist residual
voltage after power off the
Energy Storage System, it
needs to wait for 30 minutes to
ensure that the discharge is
completed, then the
maintenance can be operated.
Anti electric shock
warning symbol
This Energy Storage System has
high voltage during operation. All
operations of the Energy Storage
System must be operated by
trained professional electrical
technician.
There are potential danger
after the Energy Storage
System is operated. Please
take precautions during